category-banner

Implementing Lean Six Sigma To Eliminate Eight Wastes

Rating:
90%

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

The following slide showcases the eight wastes in manufacturing process that hampers the productivity. It includes defects, overproduction, waiting, non utilized talent, transportation, inventory, motion and extra processing. Presenting our set of slides with name Implementing Lean Six Sigma To Eliminate Eight Wastes. This exhibits information on eight stages of the process. This is an easy-to-edit and innovatively designed PowerPoint template. So download immediately and highlight information on Defects, Overproduction, Transportation,Inventory.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Charlie Jackson

    I didn’t expect such a good service for the money I am paying. But, they exceed my expectations. Great work SlideTeam.
  2. 80%

    by Clint Perry

    Their designing team is so expert in making tailored templates. They craft the exact thing I have in my mind…..really happy.

2 Item(s)

per page: