category-banner

Kpi for logistic efficiency commit date logr and logc powerpoint slide

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

Presenting kpi for logistic efficiency commit date logr and logc powerpoint slide. This presentation slide shows Three Key Performance Indicators or KPIs in a Dashboard style design. The first KPI that can be shown is Total Logistic Efficiency. The second KPI is ON Time in Full, Commit Date. The third is Average Time difference between LOGR and LOGC. These KPI Powerpoint graphics are all data driven, and the shape automatically adjusts according to your data. Just right click on the KPI graphic, enter the right value and the shape will adjust automatically. Make a visual impact with our KPI slides.

Rating:
100% of 100
Rate this Product:
100% of 100

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

100% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Dion Dunn

    Out of the box and creative design.
  2. 100%

    by O'Sullivan Evans

    Content of slide is easy to understand and edit.

2 Item(s)

per page: