category-banner

Sprint backlog land database development layer based scrum

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

Presenting this set of slides with name - Sprint Backlog Land Database Development Layer Based Scrum. This is a eight stage process. The stages in this process are Sprint Backlog, Land Database, Development Layer Based Scrum.

Rating:
100% of 100
Rate this Product:
100% of 100

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

100% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Jones Adams

    Commendable slides with attractive designs. Extremely pleased with the fact that they are easy to modify. Great work!
  2. 100%

    by Diego Gardner

    Thanks for all your great templates they have saved me lots of time and accelerate my presentations. Great product, keep them up!

2 Item(s)

per page: