category-banner

Three stages of lean smed with time frame

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

Presenting this set of slides with name Three Stages Of Lean SMED With Time Frame. This is a three stage process. The stages in this process are Three Stages, Lean SMED, Time Frame. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.

People who downloaded this PowerPoint presentation also viewed the following :

Content of this Powerpoint Presentation

Description:

The image illustrates a PowerPoint slide titled "Three Stages of Lean SMED with Time Frame," which is related to the Single-Minute Exchange of Dies (SMED) process, a lean manufacturing philosophy aimed at reducing and streamlining equipment setup times.

The slide is broken down into three stages:

STAGE I has a setup time of 140 minutes and involves segregating internal and external elements, with placeholders for further text.

STAGE II reduces the setup time to 90 minutes and focuses on converting internal and external elements, again with placeholders for additional information.

STAGE III shows a more significant reduction in setup time to 8 minutes, with the goal to reduce the time of internal elements, with another placeholder for details.

Each stage shows a decreasing timeline, visually indicating the efficiency gains through the SMED process. The slide suggests that through SMED, a task that initially took 140 minutes can be reduced significantly to just 8 minutes by optimizing the setup process.

Use Cases:

This slide can be effectively used in various industries focused on improving operational efficiency:

1. Manufacturing:

Use: Training on reducing machine setup times

Presenter: Operations Manager

Audience: Floor managers, machine operators

2. Automotive:

Use: Presenting time-saving strategies in vehicle assembly

Presenter: Production Engineer

Audience: Assembly line workers, process engineers

3. Aerospace:

Use: Demonstrating quick changeover methods in aerospace manufacturing

Presenter: Lean Specialist

Audience: Manufacturing teams, quality assurance staff

4. Food Processing:

Use: Streamlining setup processes in food production lines

Presenter: Process Improvement Manager

Audience: Production staff, maintenance teams

5. Pharmaceuticals:

Use: Enhancing efficiency in pharmaceutical manufacturing setups

Presenter: Quality Control Manager

Audience: Compliance officers, production personnel

6. Printing and Publishing:

Use: Decreasing setup times for printing machinery

Presenter: Print Shop Supervisor

Audience: Print operators, technical staff

7. Logistics and Supply Chain:

Use: Applying quick changeover principles to logistics operations

Presenter: Supply Chain Coordinator

Audience: Warehouse managers, logistics planners

Ratings and Reviews

0% of 100
Write a review
Most Relevant Reviews

No Reviews