Production Schedule Maker
Plan every production run by week with product lines as rows, then zoom into a line-by-line shift schedule and a delivery list for customers.
Click a day to add an event · click an event to edit it · drag to move it · click the title to rename.
Make a production schedule online
Plan every production run by week with product lines as rows, then zoom into a line-by-line shift schedule and a delivery list for customers. Master production schedules, weekly line plans and delivery schedules for plants.
This page has 3 ready-made production schedule templates. Master production schedule (MPS): 13 weeks of runs by product with the line that makes them, plus sanitation and shutdowns. Weekly production line schedule: One week by the hour: what each line runs on each shift, with changeovers and cleaning. Delivery schedule: Two months of outbound deliveries: customer, distribution center and PO for every load.
Each one works in five views — month, week, year, planner and list — and downloads as an editable PowerPoint slide, a print-ready PDF or PNG, an Excel grid with an event list, or an .ics file for Google Calendar, Outlook and Apple Calendar. There is no sign-up, and nothing you type is stored on our server.
3 Production Schedule templates
Every template opens filled in with realistic dates. Pick the closest one, then change anything.
How to make your production schedule
- 1
Pick a template and a view
The calendar above is live. Use Pick a Calendar for the closest example, then switch between Month, Week, Year, Planner and List — your events stay the same.
- 2
Add your events
Click a day to add an event, set its time, category and who runs it, and make it repeat (weekly, monthly, every quarter). Quick add fills in public holidays and key dates, or pastes a whole list from Excel.
- 3
Download or add to your calendar
PowerPoint slides stay editable, PDF and PNG print sharp, Excel gives you the grid and an event list, and the .ics file puts every event into Google Calendar, Outlook or Apple Calendar.
Key terms
- Production schedule
- A plan that says which product is made on which line, in what quantity and when, so materials, labor and equipment are ready.
- Master production schedule (MPS)
- The week-by-week plan of finished goods to produce, built from forecasts and orders; it drives material requirements planning (MRP).
- Frozen zone
- The near-term weeks of an MPS that are locked; changes inside it need sign-off because materials and crews are already committed.
- Changeover
- The time to switch a line from one product to another — cleaning, allergen wash-down, new packaging and settings.
- Delivery schedule
- The list of outbound loads with customer, ship-to location, date and order number, agreed with customers and carriers.
Questions
What is a master production schedule example?
A typical MPS lists finished products as rows and weeks as columns, showing when each product runs and on which line. The Q1 template above is a worked example for a food plant, with sanitation days, a shutdown and a monthly S&OP review.
How do I make a production schedule in Excel?
Edit the template here, then download Excel. You get the week-by-product grid plus an Events sheet with every run, its dates and line, ready to sort or paste into your ERP planning sheet.
How far ahead should a production schedule go?
Most plants keep a 12–13 week MPS rolled forward every week, with the first 2–4 weeks frozen, and a detailed daily or shift schedule for the current week.
Can I share the production calendar with the team?
Download PowerPoint for the production meeting, PDF for the shop-floor board, or an .ics file so supervisors see runs and changeovers in Outlook or Google Calendar.
Goes well with this — from our other free tools
Example content is illustrative and uses fictional names, so each page opens with a finished calendar. Replace it with yours before sharing.