Skip to content

Agile and sprint dashboard builder

Burndown, velocity and issue flow for scrum teams, plus release and DevOps views. Paste in your tracker export and take the slide to sprint review.

New here? — takes 2 minutes.

Sprint dashboard

Team Falcon, sprint 42 — Sprint 42, day 7 of 10

Committed

64 pts
sprint goal set

Completed

43 pts
62% of scope

Remaining

26 pts
−7 today

Scope added

5 pts
+5 since start

Burndown (story points)

IdealRemaining
0
20
40
60
80
2619
D0D1D2D3D4D5D6D7

Velocity, last six sprints

CommittedCompleted
0
20
40
60
80
Committed: 58Completed: 51
Committed: 60Completed: 57
Committed: 62Completed: 55
Committed: 60Completed: 59
Committed: 64Completed: 58
Committed: 62Completed: 60
S36S37S38S39S40S41

Sprint issues by status

29Issues
Done14 48%
In review4 14%
In progress6 21%
To do5 17%

Blocked and at-risk issues

KeySummaryAssigneePointsStatus
FAL-412, criticalRefund webhook retriesN. Haddad8Blocked
FAL-418, warningSaved cards on AndroidJ. Kowalski5In progress
FAL-421, seriousCheckout copy reviewA. Fontaine2Waiting on legal
FAL-425, goodRate limit dashboardR. Tanaka3In review

4 Jira and Agile Dashboard templates

Every template opens as a finished dashboard. Pick the closest one, then change anything.

Metrics and how to calculate them

The KPIs these templates are built on, with the formula behind each one.

Velocity
Story points completed in a sprint; use the average of the last three to six sprints for planning.
Sprint burndown
Remaining story points at the end of each day of the sprint, plotted against the ideal straight line to zero.
Cycle time
Time from work starting on an issue to it being done, reported as a median.
PI predictability
Business value achieved ÷ business value planned for the program increment × 100.
Deployment frequency
Production deployments ÷ days in the period.
Change failure rate
Deployments that caused a failure in production ÷ total deployments × 100.
Time to restore service
Average time from a production failure starting to service being restored.

How to make your Jira and Agile Dashboard

Pick a template, put your numbers in, download — about two minutes. Nothing to install; the PDF and every other format come with a SlideTeam plan.

  1. 1

    Pick your dashboard

    Click Pick Your Dashboard. This dashboard has 4 ready-made layouts, such as Sprint dashboard and Jira-style project dashboard. Each opens finished, with example figures.

  2. 2

    Change the numbers

    Point at any widget (tap it on a phone) and choose Edit to type or paste its numbers and labels — a column copied from Excel pastes straight in. Click the dashboard's title to rename it.

  3. 3

    Use your own data

    Upload CSV or Excel takes a CSV, .xlsx or .xls file and shows exactly what it read: pick the sheet, the label column and how repeated rows are combined (sum, average, count), then Build a new dashboard or Fill this template with your columns. Not sure of the layout? Download the sample CSV and replace the numbers.

  4. 4

    Download PDF, PowerPoint, Excel and more

    Download (right end of the toolbar) lists every format: a PDF (free), PowerPoint with native charts you can still edit (right-click › Edit data), a report pack (summary slide plus one slide per chart) as PowerPoint or PDF, Excel (opens on a Dashboard sheet with live charts) and a CSV for Power BI, Tableau or Google Sheets.

  5. 5

    More options: add widgets, brand it, share

    More options (top right) shows the rest: Add widget puts in a chart, KPI tile, table, funnel or a Text / commentary box; the arrows on a widget move it and ✕ removes it; click the subtitle to edit it. Customise sets the currency, template language, slide size, brand colour and logo. Sheets / Slides shows how to open your file in Google Sheets or Slides; Share copies a link to this exact dashboard.

Common questions

What goes on a scrum or sprint dashboard?

A burndown of remaining points, velocity for recent sprints, the sprint's issues by status and a list of blocked work. The Sprint dashboard template has all four.

Is this a Jira dashboard?

It is not connected to Jira. The Jira-style template reproduces the common dashboard gadgets, created vs resolved, issues by status and by assignee, so you can paste in a Jira CSV export and present it as a slide.

What are DORA metrics?

Four DevOps measures of delivery performance: deployment frequency, lead time for changes, change failure rate and time to restore service. The DevOps template tracks each with a six-month trend.

How do I load my sprint data?

Export issues from your tracker as CSV and upload it, or edit the numbers in each widget. The first text column becomes labels and numeric columns become series.

Goes well with this — from our other free tools

The figures in the example dashboards are illustrative and exist so each page shows a finished dashboard rather than an empty grid. Replace them with yours before sharing anything.