Project management dashboard builder

Schedule, cost and scope health for one project or several. Replace the numbers with yours or upload a CSV, then export the slide for your status meeting.

New here? — takes 2 minutes.

Project health dashboard

Customer portal rebuild — Week 38, status at 18 September

Percent complete

64%
+8 pts

Schedule performance

0.94
−0.03

SPI = EV ÷ PV

Cost performance

1.03
+0.02

CPI = EV ÷ AC

Open issues

12
−2

Earned value, cumulative ($k)

Planned valueEarned valueActual cost
0
250
500
750
1k
840790767
AprMayJunJulAugSep

Tasks by status

228Tasks
Done142 62%
In progress38 17%
Not started41 18%
Blocked7 3%

Phase completion

Discovery, good100%
Design, good100%
Build, warning72%
Testing, warning18%
Launch readiness5%

Top issues and risks

IDIssueOwnerDue
I-031, criticalPayment API sandbox unstableD. Mensah25 Sep
R-012, seriousSSO vendor contract unsignedL. Park30 Sep
I-028, warningTwo front-end devs on leaveK. Novak02 Oct
R-009, warningLoad test scope not agreedT. Alvarez09 Oct

4 Project Management Dashboard templates

Every template opens as a finished dashboard. Pick the closest one, then change anything.

Metrics and how to calculate them

The KPIs these templates are built on, with the formula behind each one.

Percent complete
Earned value ÷ budget at completion × 100, or completed work ÷ total planned work where EV is not tracked.
Schedule performance index (SPI)
Earned value ÷ planned value; below 1.0 means less work is done than planned by now.
Cost performance index (CPI)
Earned value ÷ actual cost; below 1.0 means the work done has cost more than budgeted.
Schedule variance
Earned value − planned value in currency, or forecast finish − baseline finish in days.
Total float
Latest finish − earliest finish for an activity; activities with zero or negative float are on the critical path.
Milestone hit rate
Milestones completed by their baseline date ÷ milestones due in the period × 100.
Open issues
Logged issues not yet closed at period end, usually shown with age and owner.

How to make your Project Management Dashboard

Pick a template, put your numbers in, download — about two minutes. Nothing to install; the PDF and every other format come with a SlideTeam plan.

  1. 1

    Pick your dashboard

    Click Pick Your Dashboard. This dashboard has 4 ready-made layouts, such as Project health and Multiple projects overview. Each opens finished, with example figures.

  2. 2

    Change the numbers

    Point at any widget (tap it on a phone) and choose Edit to type or paste its numbers and labels — a column copied from Excel pastes straight in. Click the dashboard's title to rename it.

  3. 3

    Use your own data

    Upload CSV or Excel takes a CSV, .xlsx or .xls file and shows exactly what it read: pick the sheet, the label column and how repeated rows are combined (sum, average, count), then Build a new dashboard or Fill this template with your columns. Not sure of the layout? Download the sample CSV and replace the numbers.

  4. 4

    Download PDF, PowerPoint, Excel and more

    Download (right end of the toolbar) lists every format: a PDF (free), PowerPoint with native charts you can still edit (right-click › Edit data), a report pack (summary slide plus one slide per chart) as PowerPoint or PDF, Excel (opens on a Dashboard sheet with live charts) and a CSV for Power BI, Tableau or Google Sheets.

  5. 5

    More options: add widgets, brand it, share

    More options (top right) shows the rest: Add widget puts in a chart, KPI tile, table, funnel or a Text / commentary box; the arrows on a widget move it and ✕ removes it; click the subtitle to edit it. Customise sets the currency, template language, slide size, brand colour and logo. Sheets / Slides shows how to open your file in Google Sheets or Slides; Share copies a link to this exact dashboard.

Common questions

What should a project management dashboard show?

Percent complete, schedule and cost performance (SPI and CPI), open issues and the next milestones. The Project health template covers one project; the Multiple projects template puts a whole delivery portfolio on one slide.

How do I build a dashboard for multiple projects?

Use one row per project with manager, percent complete, budget used, forecast finish and a RAG status, then add a chart of overruns and a milestone trend. The Multiple projects overview template is set up that way.

What is a CPM dashboard?

A critical path method dashboard tracks the activities with zero or negative float, how the forecast finish is moving against baseline, and which activities are starting late.

Can I put my project data from a spreadsheet into this?

Yes. Upload a CSV or Excel export from your scheduling tool, or type numbers into any widget, then download an editable PowerPoint slide or an Excel workbook.

Goes well with this — from our other free tools

The figures in the example dashboards are illustrative and exist so each page shows a finished dashboard rather than an empty grid. Replace them with yours before sharing anything.