PERT Chart Maker

Saved

Arrow keys move between shapes. Enter or F2 edits the text, Tab adds the next step, Delete removes the shape. Alt plus arrow keys move it. Press Escape, then Tab, to leave the canvas.

Double-click to add Tab next step Space+drag to pan
PERT Chart templates, how-to guide & FAQs

PERT Chart Maker: Map task dependencies, find the critical path and estimate durations

A PERT chart shows the tasks of a project as a network of boxes or events joined by arrows, so you can see what depends on what and which chain of tasks, the critical path, sets the finish date. Start from an activity-on-node PERT chart diagram, a French diagramme de PERT with events and dates, a Spanish diagrama de PERT, or a three-point estimate table.

5 ready-made templatesEditable PowerPoint exportPNG, SVG & PDFNo sign-up

PERT Chart templates

Click a template to open it in the editor above. Change any text, colour or shape, then download it.

How to make a PERT chart

Short on time?

  1. List the activities

    Write each task with a letter, a short name and its duration, or three estimates (O, M, P).

  2. Link dependencies

    Draw an arrow from each task to the tasks that cannot start until it finishes.

  3. Find the critical path

    Add up the longest chain of tasks; colour it red. Tasks off that path have slack.

  4. Share the plan

    Export to PowerPoint or PDF, and pair it with a Gantt chart for dates.

What you can do with it

Critical path highlight

Red arrows and boxes show the chain of tasks that sets the finish date.

Node and arrow styles

Activity-on-node boxes or the French event-and-arrow PERT method.

Three-point estimates

A ready table for O, M, P, expected time and standard deviation.

Editable export

PowerPoint, PNG, SVG and PDF downloads.

Frequently asked questions

What is a PERT chart?

PERT (Program Evaluation and Review Technique) is a network diagram of project tasks and their dependencies. It shows the critical path, the longest chain of dependent tasks, which determines the shortest possible project duration.

What is a diagramme de PERT?

Diagramme de PERT is French for PERT chart. In the classic French method the circles are events (étapes) showing earliest and latest dates, and the tasks are the arrows between them.

How is expected time calculated in PERT?

te = (O + 4M + P) / 6, where O is optimistic, M most likely and P pessimistic. The standard deviation is (P − O) / 6.

What is slack or float?

Slack is how long a task can slip without delaying the project: latest start minus earliest start. Tasks on the critical path have zero slack.

What is the difference between a PERT chart and a Gantt chart?

A PERT chart focuses on dependencies and the critical path; a Gantt chart shows the same tasks as bars on a calendar.