Eisenhower Matrix Builder
Sort your tasks by urgent and important into Do, Schedule, Delegate and Eliminate. Type straight into the boxes, then download the grid for your planner or team meeting.
Eisenhower matrix
My week — 12 to 16 October
Do first
- Finish board report due Tue
- Call back unhappy key client
- Fix failed payroll file
Schedule
- Plan Q1 budget
- 1:1s with each team member
- Online course module 3
- Gym Mon, Wed, Fri
Delegate
- Book team offsite venue
- Reply to vendor survey
- Collect expense receipts
Eliminate
- Unneeded status meeting
- Checking email every 10 min
- Reformatting old slides
About the Eisenhower Matrix Builder
It opens on the Personal weekly planner example: a typical working week sorted into the four urgent-important boxes. Pick a Matrix switches to 2 more templates: Team manager priorities (what a manager handles now, plans, hands to the team or stops doing); Student study planner (exams, assignments and distractions sorted for a busy term).
Each box is a short bullet list you type into directly, so the slide stays readable. Headings and box titles can be renamed, and the layout keeps every box the same size. When it is ready, download an editable PowerPoint slide built from native tables and shapes, an Excel workbook with drop-downs, colors and formulas, a PNG image or a CSV file. It is free, with no sign-up, and nothing you type is stored.
3 Eisenhower Matrix templates
Every template opens filled in. Pick the closest one, then change anything.
How to use the Eisenhower Matrix Builder
- 1
Pick a matrix
Click Pick a Matrix. This page has 3 ready-made templates, such as Personal weekly planner and Team manager priorities. Each opens filled in — pick the closest one.
- 2
Edit the matrix
Click into a box and type; Enter starts a new bullet. Click a box title or heading to rename it.
- 3
Add rows, columns or items
+ Add adds a row, column, criterion, item or risk. Rename the matrix in the title box; Undo (Ctrl+Z) reverses any change.
- 4
Download
Download lists every format: a PDF (landscape, one page), an editable PowerPoint slide with native tables and shapes, Excel with drop-downs, colors and formulas, a PNG image, CSV, and a project file to open again later.
Key terms
- Urgent
- Needs attention now, usually because of a deadline or someone waiting.
- Important
- Contributes to your goals, results or responsibilities.
- Do
- Urgent and important — handle it yourself, today.
- Schedule
- Important but not urgent — put it in the calendar before it becomes urgent.
- Delegate
- Urgent but not important to you — hand it to someone else.
- Eliminate
- Neither urgent nor important — stop doing it.
Questions
What is the Eisenhower matrix?
A 2×2 grid that sorts tasks by urgency and importance into four boxes: do first, schedule, delegate and eliminate. It is named after US President Dwight D. Eisenhower.
Which quadrant should I spend the most time in?
Schedule — important but not urgent. Time spent there on planning, learning and relationships keeps fewer tasks from becoming urgent emergencies.
How is the Eisenhower matrix different from a prioritization matrix?
The Eisenhower matrix is for personal tasks and uses urgency and importance. A prioritization matrix usually ranks projects or ideas by impact and effort.
Can I download the Eisenhower matrix as PowerPoint or Excel?
Yes. The PowerPoint download is an editable slide built from native tables and shapes, and the Excel workbook keeps drop-downs, colors and formulas. PNG and CSV are there too. It is free, with no sign-up.
Goes well with this — from our other free tools
Example content is illustrative and exists so each page opens with a finished matrix. Replace it with yours before sharing.

SlideTeam