Kraljic Matrix Builder
Place each purchase category by supply risk and profit impact to choose how to buy it. Drag items into strategic, leverage, bottleneck or non-critical, then download for the sourcing plan.
Kraljic matrix
Machinery manufacturer — purchase categories
About the Kraljic Matrix Builder
It opens on the Manufacturing purchase categories example: direct and indirect spend of a machinery manufacturer placed on the four quadrants. Pick a Matrix switches to 2 more templates: IT procurement (software, hardware and services in an IT budget, sorted by risk and spend impact); Hospital procurement (clinical and non-clinical supplies of a regional hospital by risk and cost impact).
Each item is a dot you drag between the quadrants; it takes the color of the cell it lands in, and bubble sizes can show a third measure. Rename the cells and axes to match the model your team uses. When it is ready, download an editable PowerPoint slide built from native tables and shapes, an Excel workbook with drop-downs, colors and formulas, a PNG image or a CSV file. It is free, with no sign-up, and nothing you type is stored.
3 Kraljic Matrix templates
Every template opens filled in. Pick the closest one, then change anything.
How to use the Kraljic Matrix Builder
- 1
Pick a matrix
Click Pick a Matrix. This page has 3 ready-made templates, such as Manufacturing purchase categories and IT procurement. Each opens filled in — pick the closest one.
- 2
Edit the matrix
Drag a dot to move it (or use the arrow keys); double-click an empty spot to add an item. Click a cell or axis name to rename it.
- 3
Add rows, columns or items
+ Add adds a row, column, criterion, item or risk. Rename the matrix in the title box; Undo (Ctrl+Z) reverses any change.
- 4
Download
Download lists every format: a PDF (landscape, one page), an editable PowerPoint slide with native tables and shapes, Excel with drop-downs, colors and formulas, a PNG image, CSV, and a project file to open again later.
Key terms
- Strategic items
- High profit impact and high supply risk: build long-term partnerships with few suppliers.
- Leverage items
- High profit impact, low supply risk: many suppliers, so use tenders and volume to cut cost.
- Bottleneck items
- Low profit impact but high supply risk: secure supply with stock or backup suppliers.
- Non-critical items
- Low impact and low risk: simplify buying with catalogues and purchase cards.
- Supply risk
- How hard it would be to get the item if a supplier failed — few suppliers, long lead times.
Questions
What is the Kraljic matrix?
A purchasing portfolio model by Peter Kraljic (1983). It sorts what a company buys by supply risk and profit impact into strategic, leverage, bottleneck and non-critical items, each with its own buying approach.
Where does each Kraljic quadrant sit?
With supply risk across and profit impact up: leverage is top-left, strategic top-right, non-critical bottom-left and bottleneck bottom-right.
How do I measure profit impact?
Most teams use annual spend, plus how much the item affects product quality or margin. Score each category and place it on the 0–100 scale.
Is there a Kraljic matrix template in Spanish?
The page is in English, but every label is editable: rename the quadrants to Estratégico, Apalancamiento, Cuello de botella and No crítico before you download.
Can I download the Kraljic matrix as PowerPoint or Excel?
Yes. The PowerPoint download is an editable slide built from native tables and shapes, and the Excel workbook keeps drop-downs, colors and formulas. PNG and CSV are there too. It is free, with no sign-up.
Goes well with this — from our other free tools
Example content is illustrative and exists so each page opens with a finished matrix. Replace it with yours before sharing.

SlideTeam