Stakeholder Matrix Builder
Map stakeholders by power and interest, or assess how engaged each one is today against where you need them. Drag, click and type, then download for the plan.
Stakeholder matrix
Power and interest — CRM rollout
About the Stakeholder Matrix Builder
It opens on the Power-interest grid example: drag each stakeholder to show how much power and interest they have. Pick a Matrix switches to 2 more templates: Engagement assessment matrix (where each stakeholder is today (C) and where you need them (D)); Influence-impact grid (influence over the project against how much the project affects them).
Each item is a dot you drag between the quadrants; it takes the color of the cell it lands in, and bubble sizes can show a third measure. Rename the cells and axes to match the model your team uses. When it is ready, download an editable PowerPoint slide built from native tables and shapes, an Excel workbook with drop-downs, colors and formulas, a PNG image or a CSV file. It is free, with no sign-up, and nothing you type is stored.
3 Stakeholder Matrix templates
Every template opens filled in. Pick the closest one, then change anything.
How to use the Stakeholder Matrix Builder
- 1
Pick a matrix
Click Pick a Matrix. This page has 3 ready-made templates, such as Power-interest grid and Engagement assessment matrix. Each opens filled in — pick the closest one.
- 2
Edit the matrix
Drag a dot to move it (or use the arrow keys); double-click an empty spot to add an item. Click a cell or axis name to rename it.
- 3
Add rows, columns or items
+ Add adds a row, column, criterion, item or risk. Rename the matrix in the title box; Undo (Ctrl+Z) reverses any change.
- 4
Download
Download lists every format: a PDF (landscape, one page), an editable PowerPoint slide with native tables and shapes, Excel with drop-downs, colors and formulas, a PNG image, CSV, and a project file to open again later.
Key terms
- Power
- How much a stakeholder can change or stop the project.
- Interest
- How much they care about it or are affected by it.
- Manage closely
- High power, high interest: involve them in decisions.
- Engagement level
- Unaware, resistant, neutral, supportive or leading — the PMI scale.
Questions
What is a stakeholder matrix?
A grid that places stakeholders by two measures — most often power and interest — so you can see who to manage closely, keep satisfied, keep informed or simply monitor.
What is a stakeholder engagement assessment matrix?
A table of stakeholders against engagement levels from unaware to leading, marking where each one is today and where you need them to be.
How do I move a stakeholder on the grid?
Drag the dot. Its color changes to the quadrant it lands in, and the Excel download lists each stakeholder with their quadrant.
Can I download the stakeholder matrix as PowerPoint or Excel?
Yes. The PowerPoint download is an editable slide built from native tables and shapes, and the Excel workbook keeps drop-downs, colors and formulas. PNG and CSV are there too. It is free, with no sign-up.
Goes well with this — from our other free tools
Example content is illustrative and exists so each page opens with a finished matrix. Replace it with yours before sharing.

SlideTeam