Skip to content

After Action Review Builder

The four AAR questions on slides: what was supposed to happen, what actually happened, why, and what we will sustain or improve — with the numbers and actions.

Your numbers

MetricUnitBetterTargetActual Black Friday 2025Black Friday 2024vs targetvs lastStatusOwnerCommentary (blank = written for you)
+7.8%+19%On target
−0.5 pt−0.4 ptClose
−7 pt−3 ptClose
+180%+55.6%Off track

Paste rows straight from Excel or Google Sheets into any cell · Sample CSV · Leave Commentary blank and it is written from the numbers.

Slides

Click a slide to edit it. Hidden slides stay here but are left out of the download.

1Wins, challenges or asks

Fernlea Home · Black Friday 2025

Planned vs actual

  • What was supposed to happen

    $3.2M revenue, full uptime, 95% of orders shipped in 48 hours.

  • What actually happened

    $3.45M revenue, but 40 minutes of checkout outage and slower shipping.

After Action Review — Black Friday 20251 / 4
2Target vs actual table

Fernlea Home · Black Friday 2025

Target vs actual

MetricTargetActualvs targetvs Black Friday 2024StatusCommentary
Revenue$3.2M$3.45M▲7.8%▲19%On targetRevenue came in at $3.45M, 7.8% better than the $3.2M target, and up 19% on Black Friday 2024.
Site uptime100%99.4%▼0.5 pt▼0.4 ptCloseSite uptime came in at 99.4%, 0.5 pt short of the 100% target, and down 0.4 pt on Black Friday 2024.
Orders shipped in 48 hours95%88%▼7 pt▼3 ptCloseOrders shipped in 48 hours came in at 88%, 7 pt short of the 95% target, and down 3 pt on Black Friday 2024.
Contact center wait5 mins14 mins▲180%▲55.6%Off trackContact center wait came in at 14 mins, 180% short of the 5 mins target, and up 55.6% on Black Friday 2024.
After Action Review — Black Friday 20252 / 4
3Lessons learned

Fernlea Home · Black Friday 2025

Why, sustain, improve

Why it happened

  • Checkout service not load-tested above 2x traffic
  • Warehouse temp staff started a day late

Sustain

  • Early-access email to loyalty members
  • Live war-room channel

Improve

  • Load test to 4x peak
  • Temp staff onboarding a week earlier
After Action Review — Black Friday 20253 / 4
4Next steps

Fernlea Home · Black Friday 2025

Next steps

ActionOwnerDue
01Load test at 4x by 1 NovemberEngineering1 Nov
02Temp-staff start date moved to 17 NovemberWarehouse17 Nov
After Action Review — Black Friday 20254 / 4

About the After Action Review Builder

It opens on the After action review template (4 slides): AAR after an event, incident, launch or exercise. Pick a Review switches to one more template: Project closure report (closing a project: outcomes against goals, lessons and handover).

The example numbers track Revenue, Site uptime, Orders shipped in 48 hours and Contact center wait. Each metric has a target, an actual and last period's figure. The builder works out the variance, scores it red, amber or green (costs and other lower-is-better metrics the right way round) and writes a sentence of commentary from the numbers, which you can overwrite. Paste rows from Excel, upload a CSV, edit any slide's words, and hide or add slides.

Download an editable PowerPoint deck built from native tables and charts, with talking points in the speaker notes, and an Excel workbook whose variance and status are live formulas. Save the review as a small file and, next period, open it and press Next period. It is free, with no sign-up, and nothing is stored.

For a one-page written closure report, use the project closure report maker.

2 After Action Review templates

Each opens with example numbers. Switching keeps nothing from your edits, and Undo brings them back.

How to use the After Action Review Builder

  1. 1

    Pick a review

    Click Pick a Review. This page has 2 ready-made templates, such as After action review and Project closure report. Each opens as a finished deck with example numbers.

  2. 2

    Put your numbers in

    Type each metric's target, actual and last period in Your numbers, paste rows from Excel, or use Upload CSV or Excel. Status, variance and commentary update as you type.

  3. 3

    Edit the slides

    Click any slide to change its words. Hide what you don't need, or use Add slide for wins, risks, next steps and more. Undo (Ctrl+Z) reverses any change.

  4. 4

    Download

    Download lists every format: a free PDF of the slides, an editable PowerPoint deck with native tables and charts, and Excel with variance and status as formulas. The Review file is a small file: next period open it and press Next period.

Start from a spreadsheet: download the sample CSV, fill it in and upload it.

Common questions

What are the four questions of an after action review?

What was supposed to happen? What actually happened? Why was there a difference? What will we sustain and improve?

When should you run an AAR?

Soon after the event, while memories are fresh — usually within a week.

Is a post-implementation review the same thing?

Close: use the Project closure template for that.

Is it free?

Yes.

Can I download the after action review as PowerPoint or Excel?

Yes. The PowerPoint deck is built from native text, tables and charts you can edit, with commentary in the speaker notes, and the Excel workbook keeps variance and status as live formulas. Both are free, with no sign-up.

Goes well with this — from our other free tools

Example figures and names are illustrative. Replace them with yours before sharing anything.