Skip to content

Lessons Learned and Retrospective Builder

Capture what went well, what didn’t and what you will change — as columns your team can read at a glance — and turn them into actions with owners.

Your numbers

MetricUnitBetterTargetActual Phase 1Last periodvs targetvs lastStatusOwnerCommentary (blank = written for you)
+4 pt—Close
——Off track
+0.3 pt—On target

Paste rows straight from Excel or Google Sheets into any cell · Sample CSV · Leave Commentary blank and it is written from the numbers.

Slides

Click a slide to edit it. Hidden slides stay here but are left out of the download.

1KPI scorecard

Fernlea Home · Phase 1

How the project landed

Delivered on budgetClose
104%
Target 100%▲4 pt
vs last period—
Launch date slipOff track
12 days
Target 0 days—
vs last period—
Conversion after launchOn target
2.7%
Target 2.4%▲0.3 pt
vs last period—
Lessons Learned — Website Relaunch1 / 3
2Lessons learned

Fernlea Home · Phase 1

Lessons learned

Went well

  • Weekly demos kept the business close to the work
  • Performance budget set on day one
  • Content migrated early

Didn’t go well

  • Payment provider chosen late
  • Two weeks lost to unclear sign-off
  • Testing squeezed at the end

Try next time

  • Decide third-party providers in discovery
  • Name one approver per area
  • Protect two weeks for testing
Lessons Learned — Website Relaunch2 / 3
3Next steps

Fernlea Home · Phase 1

Actions

ActionOwnerDue
01Add provider decisions to the discovery checklistPMONov
02Sign-off RACI template for phase 2Project managerOct
Lessons Learned — Website Relaunch3 / 3

About the Lessons Learned and Retrospective Builder

It opens on the Project lessons learned template (3 slides): lessons learned at the end of a project or phase. Pick a Review switches to one more template: Start, stop, continue retrospective (agile team retrospective in three columns).

The example numbers track Delivered on budget, Launch date slip and Conversion after launch. Each metric has a target, an actual and last period's figure. The builder works out the variance, scores it red, amber or green (costs and other lower-is-better metrics the right way round) and writes a sentence of commentary from the numbers, which you can overwrite. Paste rows from Excel, upload a CSV, edit any slide's words, and hide or add slides.

Download an editable PowerPoint deck built from native tables and charts, with talking points in the speaker notes, and an Excel workbook whose variance and status are live formulas. Save the review as a small file and, next period, open it and press Next period. It is free, with no sign-up, and nothing is stored.

2 Lessons Learned and Retrospective templates

Each opens with example numbers. Switching keeps nothing from your edits, and Undo brings them back.

How to use the Lessons Learned and Retrospective Builder

  1. 1

    Pick a review

    Click Pick a Review. This page has 2 ready-made templates, such as Project lessons learned and Start, stop, continue retrospective. Each opens as a finished deck with example numbers.

  2. 2

    Put your numbers in

    Type each metric's target, actual and last period in Your numbers, paste rows from Excel, or use Upload CSV or Excel. Status, variance and commentary update as you type.

  3. 3

    Edit the slides

    Click any slide to change its words. Hide what you don't need, or use Add slide for wins, risks, next steps and more. Undo (Ctrl+Z) reverses any change.

  4. 4

    Download

    Download lists every format: a free PDF of the slides, an editable PowerPoint deck with native tables and charts, and Excel with variance and status as formulas. The Review file is a small file: next period open it and press Next period.

Start from a spreadsheet: download the sample CSV, fill it in and upload it.

Common questions

What is the difference between lessons learned and a retrospective?

A retrospective is a regular team habit (often every sprint). Lessons learned usually happen at the end of a project or phase. Both ask what went well, what didn’t and what to change.

Can I change the column names?

Yes: open Edit on the slide. Use two to four columns, e.g. Start / Stop / Continue or 4Ls.

How do lessons become actions?

Add them to the Next steps slide with an owner and a date; they carry over with “Next period”.

Is it free?

Yes.

Can I download the lessons learned and retrospective as PowerPoint or Excel?

Yes. The PowerPoint deck is built from native text, tables and charts you can edit, with commentary in the speaker notes, and the Excel workbook keeps variance and status as live formulas. Both are free, with no sign-up.

Goes well with this — from our other free tools

Example figures and names are illustrative. Replace them with yours before sharing anything.