Skip to content

Multi-Project Status Report Builder

For PMOs and program managers: every project’s RAG, progress, due date and owner on one slide, with the portfolio numbers and the decisions that need making.

Your numbers

MetricUnitBetterTargetActual September 2026August 2026vs targetvs lastStatusOwnerCommentary (blank = written for you)
−16 pt−6 ptOff track
−4.6%+32.1%On target
−15%+54.5%Off track
−6 pt−2 ptClose

Paste rows straight from Excel or Google Sheets into any cell · Sample CSV · Leave Commentary blank and it is written from the numbers.

Slides

Click a slide to edit it. Hidden slides stay here but are left out of the download.

1Executive summary

Harbor & Pine Foods PMO · September 2026

Executive summary

A difficult September 2026: most targets missed, with a recovery plan below.

  • 1 of 4 metrics on or above target, 1 close and 2 off track.
  • Strongest result: Portfolio spend at $5.15M, 4.6% better than target.
  • Needs attention: Projects on track at 64% against a 80% target.
  • 1 of 4 metrics improved on August 2026.

Written from your numbers. Edit to write your own.

1On target
1Close
2Off track
Project Portfolio Status — September 20261 / 5
2Workstream status

Harbor & Pine Foods PMO · September 2026

Projects at a glance

WorkstreamStatusProgressDueOwner
ERP migration (Atlas)Data migration behindAt risk62%Feb 2027A. Costa
New bakery lineOn track88%Nov 2026P. Sato
Warehouse automationSupplier insolvency riskOff track35%Mar 2027D. Kaur
E-commerce replatformOn track74%Jan 2027J. Lee
Packaging redesignComplete100%Sep 2026M. Diaz
HR systemNot started5%Jun 2027HR
Project Portfolio Status — September 20262 / 5
3KPI scorecard

Harbor & Pine Foods PMO · September 2026

Portfolio numbers

Projects on trackOff track
64%
Target 80%▼16 pt
vs August 2026▼6 pt
Portfolio spendOn target
$5.15M
Target $5.4M▼4.6%
vs August 2026▲32.1%
Benefits realizedOff track
$1.7M
Target $2M▼15%
vs August 2026▲54.5%
Milestones hitClose
84%
Target 90%▼6 pt
vs August 2026▼2 pt
Project Portfolio Status — September 20263 / 5
4Risks and issues

Harbor & Pine Foods PMO · September 2026

Risks and issues

Risk or issueImpactMitigationOwnerStatus
Automation supplier financial healthHighEscrow agreement; second supplier quoteD. KaurOff track
Shared data team overloadedMediumRe-sequence HR system start to JunePMOAt risk
Project Portfolio Status — September 20264 / 5
5Wins, challenges or asks

Harbor & Pine Foods PMO · September 2026

Decisions and asks

  • Approve second-supplier quote for automation

    $40K design study.

  • Defer HR system start to June 2027

    Frees two data engineers for Atlas.

Project Portfolio Status — September 20265 / 5

About the Multi-Project Status Report Builder

It opens on the PMO portfolio report template (5 slides): monthly portfolio review for an executive committee. Pick a Review switches to one more template: Program status (one program, several projects) (a program manager’s report across its projects).

The example numbers track Projects on track, Portfolio spend, Benefits realized and Milestones hit. Each metric has a target, an actual and last period's figure. The builder works out the variance, scores it red, amber or green (costs and other lower-is-better metrics the right way round) and writes a sentence of commentary from the numbers, which you can overwrite. Paste rows from Excel, upload a CSV, edit any slide's words, and hide or add slides.

Download an editable PowerPoint deck built from native tables and charts, with talking points in the speaker notes, and an Excel workbook whose variance and status are live formulas. Save the review as a small file and, next period, open it and press Next period. It is free, with no sign-up, and nothing is stored.

2 Multi-Project Status Report templates

Each opens with example numbers. Switching keeps nothing from your edits, and Undo brings them back.

How to use the Multi-Project Status Report Builder

  1. 1

    Pick a review

    Click Pick a Review. This page has 2 ready-made templates, such as PMO portfolio report and Program status (one program, several projects). Each opens as a finished deck with example numbers.

  2. 2

    Put your numbers in

    Type each metric's target, actual and last period in Your numbers, paste rows from Excel, or use Upload CSV or Excel. Status, variance and commentary update as you type.

  3. 3

    Edit the slides

    Click any slide to change its words. Hide what you don't need, or use Add slide for wins, risks, next steps and more. Undo (Ctrl+Z) reverses any change.

  4. 4

    Download

    Download lists every format: a free PDF of the slides, an editable PowerPoint deck with native tables and charts, and Excel with variance and status as formulas. The Review file is a small file: next period open it and press Next period.

Start from a spreadsheet: download the sample CSV, fill it in and upload it.

Terms used in this review

Benefits realized
Value delivered so far by completed projects against the business case.
Projects on track
Projects with green status as a % of active projects.

Common questions

How do I show many projects on one slide?

Use the Workstream status slide with one row per project: status, % complete, due date and owner. Up to twelve rows fit.

Can each project still have its own report?

Yes. Build the portfolio report here and a Project status report per project; both download as PowerPoint.

What does each status color mean?

On track (green), At risk (amber), Off track (red), Complete (blue) and Not started (grey).

Is it free?

Yes, free with no sign-up.

Can I download the multi-project status report as PowerPoint or Excel?

Yes. The PowerPoint deck is built from native text, tables and charts you can edit, with commentary in the speaker notes, and the Excel workbook keeps variance and status as live formulas. Both are free, with no sign-up.

Goes well with this — from our other free tools

Example figures and names are illustrative. Replace them with yours before sharing anything.