Skip to content

Quarterly Planning and OKR Builder

Set objectives and key results for the quarter, track them as the weeks go by, and score them at the end — one deck that becomes your quarterly review.

Your numbers

MetricUnitBetterTargetActual Q4 2026Q3 2026vs targetvs lastStatusOwnerCommentary (blank = written for you)
−12.7%+11%Off track
−9 pt+9 ptOff track
+40%−26.3%Off track
−12%+57.1%Off track

Paste rows straight from Excel or Google Sheets into any cell · Sample CSV · Leave Commentary blank and it is written from the numbers.

Slides

Click a slide to edit it. Hidden slides stay here but are left out of the download.

1Wins, challenges or asks

Acme Analytics — Product · Q4 2026

Objectives

  • Objective 1

    Make every new team successful in their first week.

  • Objective 2

    Win the enterprise segment.

Q4 2026 OKRs — Week 6 Check-in1 / 5
2Attainment chart

Acme Analytics — Product · Q4 2026

Key results: progress to target

KR1: Weekly active teamsTarget87%
KR2: Onboarding completion87%
KR3: Time to first dashboard71%
KR4: Enterprise SSO customers88%

Each metric as a % of its target. Lower-is-better metrics are flipped, so 100% always means on target.

Q4 2026 OKRs — Week 6 Check-in2 / 5
3Target vs actual table

Acme Analytics — Product · Q4 2026

Key results

MetricTargetActualvs targetvs Q3 2026StatusCommentary
KR1: Weekly active teamsGrowth1,5001,310▼12.7%▲11%Off trackKR1: Weekly active teams came in at 1,310, 12.7% short of the 1,500 target, though up 11% on Q3 2026.
KR2: Onboarding completionOnboarding squad70%61%▼9 pt▲9 ptOff trackKR2: Onboarding completion came in at 61%, 9 pt short of the 70% target, though up 9 pt on Q3 2026.
KR3: Time to first dashboardOnboarding squad10 mins14 mins▲40%▼26.3%Off trackKR3: Time to first dashboard came in at 14 mins, 40% short of the 10 mins target, though down 26.3% on Q3 2026.
KR4: Enterprise SSO customersPlatform2522▼12%▲57.1%Off trackKR4: Enterprise SSO customers came in at 22, 12% short of the 25 target, though up 57.1% on Q3 2026.
Q4 2026 OKRs — Week 6 Check-in3 / 5
4Workstream status

Acme Analytics — Product · Q4 2026

Initiatives

WorkstreamStatusProgressDueOwner
Guided setup wizardOn track70%NovOnboarding squad
Templates galleryDesign not signed offAt risk35%DecGrowth
SCIM provisioningOn track60%NovPlatform
Q4 2026 OKRs — Week 6 Check-in4 / 5
5Next steps

Acme Analytics — Product · Q4 2026

Next steps

ActionOwnerDue
01Sign off templates gallery designHead of Design17 Oct
Q4 2026 OKRs — Week 6 Check-in5 / 5

About the Quarterly Planning and OKR Builder

It opens on the OKR progress review template (5 slides): mid-quarter OKR check-in with progress against each key result. Pick a Review switches to one more template: Quarterly plan (next quarter’s goals, priorities and milestones).

The example numbers track KR1: Weekly active teams, KR2: Onboarding completion, KR3: Time to first dashboard and KR4: Enterprise SSO customers. Each metric has a target, an actual and last period's figure. The builder works out the variance, scores it red, amber or green (costs and other lower-is-better metrics the right way round) and writes a sentence of commentary from the numbers, which you can overwrite. Paste rows from Excel, upload a CSV, edit any slide's words, and hide or add slides.

Download an editable PowerPoint deck built from native tables and charts, with talking points in the speaker notes, and an Excel workbook whose variance and status are live formulas. Save the review as a small file and, next period, open it and press Next period. It is free, with no sign-up, and nothing is stored.

2 Quarterly Planning templates

Each opens with example numbers. Switching keeps nothing from your edits, and Undo brings them back.

How to use the Quarterly Planning and OKR Builder

  1. 1

    Pick a review

    Click Pick a Review. This page has 2 ready-made templates, such as OKR progress review and Quarterly plan. Each opens as a finished deck with example numbers.

  2. 2

    Put your numbers in

    Type each metric's target, actual and last period in Your numbers, paste rows from Excel, or use Upload CSV or Excel. Status, variance and commentary update as you type.

  3. 3

    Edit the slides

    Click any slide to change its words. Hide what you don't need, or use Add slide for wins, risks, next steps and more. Undo (Ctrl+Z) reverses any change.

  4. 4

    Download

    Download lists every format: a free PDF of the slides, an editable PowerPoint deck with native tables and charts, and Excel with variance and status as formulas. The Review file is a small file: next period open it and press Next period.

Start from a spreadsheet: download the sample CSV, fill it in and upload it.

Terms used in this review

Objective
A qualitative goal for the quarter.
Key result
A measurable outcome that shows the objective was met.

Common questions

How do OKRs work here?

Each key result is a row in the numbers grid with its target. Enter progress as the actual; the attainment chart and status show how close each is.

How are OKRs scored at quarter end?

Attainment % is the score: 100% means the key result was hit. Many teams treat 70% as a good result for stretch goals.

Can I plan next quarter from this one?

Yes: press “Next period”. Targets stay, actuals clear and become the comparison.

Is it free?

Yes.

Can I download the quarterly planning as PowerPoint or Excel?

Yes. The PowerPoint deck is built from native text, tables and charts you can edit, with commentary in the speaker notes, and the Excel workbook keeps variance and status as live formulas. Both are free, with no sign-up.

Goes well with this — from our other free tools

Example figures and names are illustrative. Replace them with yours before sharing anything.