Cost Estimate Generator
Phase-by-phase costs, contingency, assumptions and exclusions, ready to sign.
3 templates in the Cost Estimate Generator
Every template opens filled in. Pick the closest one, then change anything.
About the Cost Estimate Generator
Start from a finished cost estimate for a renovation, a software project or an event. Edit quantities and rates, and every phase total and the grand total update on their own.
The Cost Estimate Generator comes with 3 ready-made templates. Kitchen renovation cost estimate: A contractor's detailed estimate: summary, four costed phases, contingency, exclusions and sign-off. Software project cost estimate: Effort and cost by phase for an app build, with a low/likely/high range, contingency and VAT. Conference event cost estimate: A two-day leadership summit costed line by line: venue, catering, AV, speakers, staff and HST.
Every template is fully editable: set the client, your company and the date once under Details, click any text to type, change prices and quantities (totals and tax update themselves), add sections, packages, a timeline or a signature block, and switch between A4, US Letter and 16:9 slides. When it reads right, download a send-ready PDF, an editable Word document or PowerPoint, or PNG images. There is no sign-up and nothing is stored on our servers.
Inside this template: Kitchen renovation cost estimate
Cover: Kitchen Renovation Cost Estimate
Open-plan kitchen remodel at 48 Linden Avenue, Ardmore, PA · Coyle Residence · Haverford Build & Remodel · November 2, 2026
Estimate summary
The full project, including a 10% contingency, comes to $62,454.
- Erin Coyle asked Haverford Build & Remodel to price an open-plan kitchen: removing the wall between the kitchen and dining room, moving the sink to a new island, and replacing cabinets, countertops, flooring and lighting.
- Project: Address: 48 Linden Ave, Ardmore, PA · Area: 265 sq ft · Duration: 7 weeks on site · Earliest start: January 11, 2027
- Cost summary: A. Demolition and site preparation · B. Structural, plumbing and electrical · C. Cabinets, countertops and backsplash · D. Flooring, finishes and fixtures · Contingency, 10% of phases A–D
Cost breakdown by phase
Quantities are taken from drawing KD-02.
- A. Demolition and site preparation: Floor and dust protection, zip walls · Demolition of cabinets, flooring and partition wall · 20-yard dumpster, delivered and removed
- B. Structural, plumbing and electrical: LVL beam to replace load-bearing wall · Plumbing rough-in, sink moved to island · Electrical rough-in and recessed lighting · Permits and inspections
- C. Cabinets, countertops and backsplash: Semi-custom cabinets, painted maple · Cabinet installation · Quartz countertops, 3 cm, fabricated and installed · Ceramic tile backsplash
- D. Flooring, finishes and fixtures: Engineered white-oak flooring · Drywall repair, prime and paint · Sink, faucet and light fixture installation · Appliance installation · Final cleaning
Assumptions and exclusions
- This estimate assumes: Selections as listed: painted maple cabinets, Calacatta-look quartz, white-oak floor. · The subfloor is sound; up to 20 sq ft of repair is included. · Existing 200 A electrical panel has capacity for 6 new circuits. · The family will not use the kitchen during weeks 1–6.
- Not included: Appliances and plumbing fixtures (owner supplied). · Asbestos or lead abatement, if found during demolition. · Work outside the kitchen and dining room. · Changes requested after cabinet order is placed.
Payment and acceptance
- Validity Valid until December 15, 2026. Cabinet lead time is 6–8 weeks, so signing by then holds the January 11 start.
- Homeowner · For Haverford Build & Remodel
How to use the Cost Estimate Generator
- 1
Pick a template
The proposal above is live. Use Pick a Proposal to switch to the one closest to your project.
- 2
Fill in your details
Open Details to set the client, your company and the date once — every page updates. Click any text to rewrite it, change prices and quantities in the pricing table (totals add up for you), and use Add block for sections, packages, timelines and a signature page. Pages flow on their own.
- 3
Download and send
PDF is ready to email or print. Word and PowerPoint files stay fully editable, with real tables, charts and page numbers. Nothing is stored on our side.
Key terms
- Cost estimate
- An informed forecast of what a project will cost, based on known quantities and rates.
- Contingency
- A sum held back for risks you can't price yet, spent only with the client's approval.
- Three-point estimate
- Low, most likely and high figures for each phase, to show the range of outcomes.
- Exclusions
- Costs that are not in the estimate, listed so nobody assumes they are.
- Validity
- How long the prices hold before materials, rates or availability may change.
Questions
How do I write a project cost estimate?
Break the project into phases, list each item with a quantity and a rate, add a contingency for unknowns, and state your assumptions and exclusions. Finish with a validity date and a place to approve. These templates follow that structure.
What is the difference between an estimate and a quote?
An estimate is your best forecast and may change as the work is better understood. A quote is a fixed price for a defined scope. Say clearly which one you are giving.
How much contingency should a cost estimate include?
Typically 5–10% for well-defined work such as an event, and 10–20% for renovations or software, where hidden conditions are more likely.
Can I export the cost estimate as PDF or Word?
Yes. Every line total, phase total and the grand total carry over to the PDF, Word and PowerPoint downloads.
Goes well with this — from our other free tools
Example content is illustrative and uses fictional companies, people and prices, so each page opens with a finished proposal. Replace it with yours before sending.

SlideTeam