Skip to content

Cloud Migration Roadmap Builder

Plan the move to cloud in waves: assessment, landing zone, workload migration and optimization. Edit the sample roadmap and download an editable PowerPoint.

1 Milestones
Cloud migration roadmapCloud migration roadmapFrom assessment to optimized operationsQ1 2026Q2 2026Q3 2026Q4 2026Q1 2027Q2 2027StrategyStrategyFoundationFoundationMigration wavesMigration wavesDataDataOperationsOperationsBusiness case — Q1 2026 — DoneBusiness casePortfolio and 6Rs — Q1 2026 – Q2 2026 — DonePortfolio and 6RsCloud center of excellence — Q2 2026 – Q3 2026 — In progress · 50%Cloud center of excellenceLanding zone — Q1 2026 – Q2 2026 — In progress · 80%Landing zoneIdentity and network connect — Q2 2026 – Q3 2026Identity and network connectSecurity baseline — Q2 2026 – Q3 2026Security baselineWave 1: web apps — Q3 2026Wave 1: web appsWave 2: business apps — Q4 2026 – Q1 2027Wave 2: business appsWave 3: core platforms — Q1 2027 – Q2 2027 — At risk — Licensing constraintsWave 3: core platformsDatabase migration (DMS) — Q3 2026 – Q1 2027Database migration (DMS)Data lake and analytics — Q1 2027 – Q2 2027Data lake and analyticsMonitoring and runbooks — Q3 2026 – Q4 2026Monitoring and runbooksFinOps and cost optimization — Q1 2027 – Q2 2027FinOps and cost optimizationData center exit — Q2 2027Data center exitTodayDoneIn progressAt riskMilestoneToday

Tip: drag a bar to move it, drag its right edge to resize.

About this roadmap builder

This builder opens with 4 ready-made cloud migration roadmap templates. Cloud migration by wave: Foundation, application waves and operations over six quarters. Cloud strategy roadmap: Multi-year strategy covering platform, apps, security and operating model. Hybrid cloud roadmap: Hybrid and multi-cloud phases for Azure, AWS and on-premises estates. Application migration timeline: Timeline of application moves and cutover milestones by month.

A good cloud migration roadmap usually covers business case and drivers, application assessment and the 6Rs, landing zone, migration waves, data migration, security and governance and operations and FinOps. Business case and drivers: Cost, agility, resilience or data center exit dates. Drivers decide which migration strategy applies to each application. Application assessment and the 6Rs: Classify each workload as rehost, replatform, refactor, repurchase, retire or retain before scheduling waves.

Click any bar, milestone or lane to rename it or change its dates, drag bars to move or stretch them, or import your plan from Excel or a CSV export from Jira, Asana or MS Project. Then download the cloud migration roadmap as an editable PowerPoint slide built from native shapes, an Excel file with a Gantt view, or a PNG or SVG image. It is free, needs no sign-up, and nothing you type is stored.

4 Cloud Migration Roadmap templates

Every template opens as a finished roadmap. Pick the closest one, then change anything.

What to put on a cloud migration roadmap

The parts every good roadmap of this kind has — and where they go in the templates above.

Business case and drivers
Cost, agility, resilience or data center exit dates. Drivers decide which migration strategy applies to each application.
Application assessment and the 6Rs
Classify each workload as rehost, replatform, refactor, repurchase, retire or retain before scheduling waves.
Landing zone
Accounts or subscriptions, networking, identity, logging and guardrails that must exist before the first workload moves.
Migration waves
Groups of applications that move together, starting with low-risk, low-dependency systems to build confidence.
Data migration
Database replication, cutover windows and archive strategy, often the longest-running track.
Security and governance
Posture management, policy as code, tagging and compliance controls enforced from the first wave.
Operations and FinOps
Monitoring, runbooks, cost allocation and rightsizing so the cloud bill and reliability improve after migration.

How to make a cloud migration roadmap

  1. 1

    Pick a template

    Click Pick a Roadmap and choose the closest of the 4 cloud migration roadmap templates, such as Cloud migration by wave, Cloud strategy roadmap and Hybrid cloud roadmap. Each one opens finished, with realistic example content.

  2. 2

    Make it yours

    Click any bar, milestone or lane to rename it and set its dates. Drag a bar to move it, drag its right edge to stretch it, or import your plan from a CSV or Excel file (see the sample CSV).

  3. 3

    Choose a layout and colors

    Use Layout to switch between swimlane, timeline, road, Now / Next / Later, staircase, pillars, circular and vertical looks, and Colors for the palette.

  4. 4

    Download

    Download PowerPoint gives an editable slide of native shapes plus a details table. Excel adds a Gantt view; Image gives a PNG or SVG of your cloud migration roadmap.

Common questions

What is a cloud migration roadmap?

A cloud migration roadmap is a sequenced plan for moving applications, data and infrastructure to the cloud. It covers assessment, the landing zone, migration waves, cutover and optimization, with owners and dates.

What are the main stages of a cloud migration?

Typically: assess and plan, build the landing zone, migrate in waves, then optimize and operate. Each wave repeats a cycle of preparing, migrating, validating and decommissioning.

What is the difference between a cloud strategy and a cloud migration roadmap?

The strategy sets goals, principles, provider choices and operating model. The roadmap schedules the work to achieve them. The strategy roadmap template adds the platform, security and operating model tracks.

How long does a cloud migration take?

A first wave often lands in three to six months after the landing zone is ready. Full portfolio migration commonly takes 18 to 36 months, depending on application count and licensing constraints.

Does the roadmap work for Azure, AWS or Google Cloud?

Yes. The structure is provider-neutral. Rename items to match your services, such as Azure Migrate or AWS Application Migration Service, and export as an editable PowerPoint.

Goes well with this — from our other free tools

Example roadmaps are illustrative and exist so each page opens finished rather than empty. Replace the content with yours before sharing.