Skip to content

Mobile App Roadmap Builder

An app development roadmap you can edit in place — design, iOS, Android, backend, QA and store launch — then download as an editable PowerPoint slide.

2 Milestones
Mobile app development roadmapMobile app development roadmapFrom design sprint to App Store and Google PlayJan 2026Feb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026Aug 2026Sep 2026Product and designProduct and designiOSiOSAndroidAndroidBackendBackendQA and releaseQA and releaseUser flows — Jan 2026 – Feb 2026 — DoneUser flowsUI design system — Feb 2026 – Mar 2026 — DoneUI design systemPrototype — Mar 2026 – Apr 2026 — In progress · 50%PrototypeApp shell, navigation — Feb 2026 – Mar 2026 — In progress · 80%App shell, navigationCore features — Apr 2026 – Jun 2026Core featuresPush, links — Jun 2026 – Jul 2026Push, linksApp shell, navigation — Feb 2026 – Mar 2026 — In progress · 70%App shell, navigationCore features — Apr 2026 – Jun 2026Core featuresDevices — Jun 2026 – Jul 2026DevicesAPI and authentication — Feb 2026 – Apr 2026 — In progress · 60%API and authenticationData sync and offline — Apr 2026 – Jun 2026Data sync and offlineAnalytics, crashes — Jun 2026 – Jul 2026Analytics, crashesTest plan and automation — Apr 2026 – May 2026Test plan and automationBeta — Jul 2026 – Aug 2026 — 200 testersBetaStore submission — Sep 2026Store submissionPublic launch — Sep 2026Public launchTodayDoneIn progressMilestoneToday

Tip: drag a bar to move it, drag its right edge to resize.

About this roadmap builder

This builder opens with 4 ready-made mobile app roadmap templates. App development plan: Nine months of design, iOS, Android, backend and QA work through to store release. App store launch timeline: Milestones from beta to store approval and the first weeks live. App product roadmap: Now / Next / Later feature roadmap for a live app, by engagement, revenue and platform. Android developer learning path: A top-to-bottom learning path for a developer building a first Android or cross-platform app.

A good mobile app roadmap usually covers product goals and target users, design and prototyping, platform workstreams, backend and integrations, QA, beta and device coverage, store submission and launch and post-launch roadmap. Product goals and target users: Who the app is for and the outcome it must achieve: installs, activation, retention or revenue. Design and prototyping: Discovery, user flows, UI design system and prototype testing, finished before heavy engineering starts.

Click any bar, milestone or lane to rename it or change its dates, drag bars to move or stretch them, or import your plan from Excel or a CSV export from Jira, Asana or MS Project. Then download the mobile app roadmap as an editable PowerPoint slide built from native shapes, an Excel file with a Gantt view, or a PNG or SVG image. It is free, needs no sign-up, and nothing you type is stored.

4 Mobile App Roadmap templates

Every template opens as a finished roadmap. Pick the closest one, then change anything.

What to put on a mobile app roadmap

The parts every good roadmap of this kind has — and where they go in the templates above.

Product goals and target users
Who the app is for and the outcome it must achieve: installs, activation, retention or revenue.
Design and prototyping
Discovery, user flows, UI design system and prototype testing, finished before heavy engineering starts.
Platform workstreams
iOS, Android or cross-platform, each with its own lane so effort and risk are visible per platform.
Backend and integrations
APIs, authentication, data sync, payments and analytics the app depends on; often the critical path.
QA, beta and device coverage
Test automation, TestFlight and Play beta tracks, and the device and OS matrix you commit to support.
Store submission and launch
Listing assets, review lead time (allow for rejections), staged rollout and the launch campaign.
Post-launch roadmap
Retention features, monetization and platform updates after release, usually grouped now / next / later.

How to make a mobile app roadmap

  1. 1

    Pick a template

    Click Pick a Roadmap and choose the closest of the 4 mobile app roadmap templates, such as App development plan, App store launch timeline and App product roadmap. Each one opens finished, with realistic example content.

  2. 2

    Make it yours

    Click any bar, milestone or lane to rename it and set its dates. Drag a bar to move it, drag its right edge to stretch it, or import your plan from a CSV or Excel file (see the sample CSV).

  3. 3

    Choose a layout and colors

    Use Layout to switch between swimlane, timeline, road, Now / Next / Later, staircase, pillars, circular and vertical looks, and Colors for the palette.

  4. 4

    Download

    Download PowerPoint gives an editable slide of native shapes plus a details table. Excel adds a Gantt view; Image gives a PNG or SVG of your mobile app roadmap.

Common questions

What is a mobile app development roadmap?

It is a plan that sequences the work of building an app: discovery and design, platform development, backend, testing, store submission and launch. It shows what each team does and when, so dependencies are visible.

How long does it take to develop a mobile app?

A focused first version typically takes four to nine months with a small team. Complex apps with payments, offline sync or regulated data take longer; plan a beta of at least four weeks before store submission.

What is the difference between an app roadmap and a product roadmap?

A development roadmap covers building and launching the app. A product roadmap covers what you add once it is live: features, experiments and platform work, usually organized around outcomes like retention.

Should I plan iOS and Android separately?

Yes if you build native apps, because each platform has its own work, review process and timing. With a cross-platform framework use one app lane and keep platform-specific work, like store listing, separate.

Can I import my plan from Excel or Jira?

Yes. Upload a CSV or Excel file with Lane, Item, Start, End and Status columns, then download the roadmap as an editable PowerPoint slide.

Goes well with this — from our other free tools

Example roadmaps are illustrative and exist so each page opens finished rather than empty. Replace the content with yours before sharing.