Pick a change management model — ADKAR, Lewin's three steps or the change life cycle with 4M — and fill it in for your change. Press Start blank to answer the question in each step.

Preview of the ADKAR change management model template

About the Change Management Framework Builder

Pick a change management model — ADKAR, Lewin's three steps or the change life cycle with 4M — and fill it in for your change. Press Start blank to answer the question in each step.

Change management framework: A structured model for moving people and organisations from the current way of working to a new one.

ADKAR: Prosci's model of individual change: Awareness, Desire, Knowledge, Ability and Reinforcement.

The Change Management Framework Builder includes 3 ready-made examples, each with realistic sample content:

Tips for a better result: Choose one model and use its words consistently; mixing three frameworks on one slide confuses people. ADKAR works person by person: find the first element that is weak and fix that before moving on. Plan for the dip: performance usually drops before it improves, so set expectations early.

3 Change Management Framework examples

Every example opens filled in. Pick the closest one, then change anything — or press Start blank.

How to make your Change Management Framework

  1. 1

    Pick an example

    The framework above is live. Use Pick a Framework to switch to the closest example, or Start blank to keep the structure and answer the questions yourself.

  2. 2

    Click and type

    Click any text and type. Enter adds a new point, Backspace on an empty point removes it. Click a box to change its colour, add boxes or arrows. Guide lists the questions to answer, box by box.

  3. 3

    Download

    PowerPoint gives you an editable slide where every box and word is a real shape. Word adds all the text as editable lists. PDF and PNG keep the exact look. Nothing is stored on our side.

Key terms

Lewin's three-step model
Kurt Lewin's model: unfreeze the current state, make the change, then refreeze so the new way becomes stable.
Change management life cycle
The phases a change goes through: prepare, plan, implement and sustain.
4M change
In manufacturing, any change to Man, Machine, Method or Material, which must be assessed and approved before it reaches production.
Change curve
The typical dip and recovery in morale and performance as people go through a change.

Questions

Which change management framework should I use?

Use ADKAR when the challenge is getting individuals to adopt something new, Lewin's model for a simple story of the whole change, Kotter's 8 steps for a large organisation-wide programme, and a 4M life cycle for controlled changes in manufacturing.

What are the stages of the change management life cycle?

Prepare (case, sponsor, readiness), plan (steps, owners, training), implement (carry it out and track it) and sustain (embed, measure and close). Some versions add a review stage at the end.

What is 4M change management?

A manufacturing practice where any change to Man (people), Machine, Method or Material is recorded, risk-assessed, trialled and approved, often with the customer, before it goes into production.

What is the change management curve?

A picture of how morale or performance typically falls when a change starts and then recovers and rises as people adapt. Planning support for the dip shortens it.

Can I download a change management PPT?

Yes. Each model downloads as an editable PowerPoint slide where every step, arrow and bullet is a shape you can change. Word, PDF and PNG are also available.