Businesses or contractors need not worry about better bench-marking of projects. Construction playbook provides guidelines on estimating the range of what projects should cost & their actual value. Read out these guidelines and get handy on a competent playbook for yourself.

 

 

What is the Agenda behind Construction Playbook?

There is always a gap between time forecasts & out-turn of the projects and project cost. Thus, the construction playbook aims to improve the focus on outcomes from projects, drive effectiveness, and guide rapid industry change.

 

Furthermore, it plays a vital role while defining guidelines for the workplace and building health, safety, etc. It acts as a guide for construction projects to promote social value and focus & support on the whole life cycle.

 

 

Does the Construction Playbook Promotes Industry Change?

Definitely yes, especially post Covid-19. Reason is, the safety at the work site by maintaining proper data sheets for risk mitigation plans. Moreover, getting construction projects done right from the start requires structured guidelines.

 

 

Via Giphy

 

These regulations may take longer to finish the project and cost more than was initially predicted. Consequently, all these guidelines of government and businesses have a trickle-down effect. Also, all the procurement processes mentioned in the Construction playbook are going to have a positive impact on the industry.

 

The change in either work structure or guidelines will promote better fulfillment of goals, more efficiency, cost management, less wastage of carbon, etc.

 

 

How is the Construction Playbook supporting work structure of Variant Construction Platforms?

Construction playbook highlights standardized and interoperable activities & work schedules. All this becomes a genuine concern for organizations and contractors to illustrate the results, define plans, and highlight improvements wherever required.

 

Consequently, businesses must rethink their traditional approaches to keep a look at the construction projects. The guidelines defined in the playbook support variant platforms in their projects but also help the construction industry change for the better.

 

Also, the construction industry has many opportunities in the future that need to be embraced and utilized with competent techniques.

 

 

Manage Construction Project Pipeline and Optimize Project Schedule. Take a Note of Vital Guidelines for your Construction Playbook

Looking forward to preparing an appealing playbook for your organization, don’t worry! Today we are here to exhibit one of the compelling & powerful Construction Playbook.

 

We assure you that it is solid enough to communicate crucial information & at the same time make you learn about the vital guidelines.

 

Moreover, one can even customize the slides based on their specific business requirements.

 

Sit back comfortably as we take you to ride for vital guidelines in the construction playbook!

 

Book a free demo now!

 

Slide 1: Cover Page

The first slide of the playbook has to display the title and company’s name. This slide shows the title i.e., Construction Playbook and your company name.

 

It can also include a remarkable image related to the playbook or its agenda. Through this slide, you give impression to stakeholders about what this playbook contains.

 

While presenting, one can even highlight details about construction procedures and its purpose for the organization. After that, you can proceed with vital guidelines of the playbook.

 

 

Construction Playbook Powerpoint Presentation Slides

Download this 100% Editable Slide from Playbook Template

 

 

Slide 2: Different Construction Projects Pipeline Management

First guideline for the construction playbook is defining pipeline management. Thus, this slide shows various construction projects catered by firms with details about the sectors with which projects are associated. Such as:

 

• Social infrastructure
• Transport
• Energy
• Defense
• Utilities
• Communications, etc.

 

For management of pipeline, various other basis included in the table is no. of projects, avg duration, estimated contract value, and priority level.

 

Moreover, other key takeaways presented in the guideline show details for various construction projects, like:

• Repair & maintenance services
• Commercial & institutional construction
• Heavy industrial construction
• Construction work-building, design, civil engineering, etc.

 

 

Construction Playbook PowerPoint Presentation Slides

Download this 100% Editable Slide from Playbook Template

 

 

Slide 3: Flat Slab Construction Method

This slide includes construction methods. Henceforth, this slide exhibits information for the flat slab construction method and details about aspects to consider slab thickness utilization.

 

Thus, the aspects to consider to ensure utilization of slab thickness to optimum level are:

 

• Process related to design
• Presence & absence of holes
• Impact of deflection
• Previous layout application know-how, etc.

 

Also, showcase the image for the typical hardy slab of construction method, highlighting provided steel mesh above rugged slab and reinforcement between bricks.

 

Furthermore, you must illustrate vital details of the flat slab method. Some of them include:

 

• Offers flexibility in design layout
• Shorter construction time
• Buildable score
• Usage of concrete flat slabs
• Ensures floor-to-floor height reduction, etc.

 

 

Construction Playbook PowerPoint Presentation Slides

Download this 100% Editable Slide from Playbook Template

 

 

Slide 4: Insulated Concrete Framework (ICF) Construction Method

Another essential guideline for the construction playbook is showcasing an insulated concrete framework. Thus, this slide displays information for the framework construction method as a modern construction method along with its associated benefits.

 

You have to present an insulated concrete framework diagram in the playbook, highlighting elements such as cladding, insulated concrete, and insulating framework.

 

Additionally, one must explain details about this framework construction method. Key takeaways include:

 

• ICF system caters to twin-walled panels having polystyrene blocks/panels
• Prepared framework is filled with concrete
• Polystyrene blocks offer a higher level of thermal insulation
• Concrete core offers improved robustness & sound insulation, etc.

 

The ICF construction method's benefits are that it is cost-effective, etc. Also, the framework includes types of buildings, multi-story cinemas, etc.

 

 

Construction Playbook PowerPoint Presentation Slides

Download this 100% Editable Slide from Playbook Template

 

 

Slide 5: Timber Frames Construction Method

Explain the timber frames construction method to stakeholders. Thus, this slide presents information regarding the modern TF construction method and its benefits.

 

Key highlights of the timber frames construction method are as follows:

 

• Utilize a wide range of structural frames
• Sustainable construction methods developed through renewal materials, etc.

 

Moreover, one must display a detailed timber frame structure that includes dimensions for fiber wool insulation alternative, fermacell board, service void batten, timber frame, multi-layer vapor control, clear cavity, etc.

 

The key benefits of the timber frame construction method are better insulation, faster weatherproofing, faster construction, etc.

 

 

Construction Playbook PowerPoint Presentation Slides

Download this 100% Editable Slide from Playbook Template

 

 

Slide 6: Managing Bidding Process across Construction Project

This slide showcase in the construction playbook is bidding process management. Hence, it provides information regarding its management across construction projects. It details the types of bids issued by the owner and contract selection methods.

 

There are two types of bids that the project owner issues. They are open bid and close bid. You have to present details and features of these bid processes in the playbook’s slide.

 

Additionally, while highlighting details for the contract selection method, exhibit a table that defines the method, description, and actions taken.

 

The three bidding process contract selection methods are low bid selection, best value bid selection, and qualification-based selection.

 

 

Construction Playbook PowerPoint Presentation Slides

Download this 100% Editable Slide from Playbook Template

 

 

Slide 7: Project Charter for Construction Schedule Overview

You must highlight details for project charter schedule. This slide shows information regarding the construction project charter, which provides a brief overview of how the project is carried out, including the stakeholders involved.

 

Consequently, the essential elements to highlight in this project charter schedule include:

 

• Project name, initiation date, completion date
• Project description, project scope
• Deliverables, risks & issues
• Assumptions/dependencies, milestone schedule
• Stakeholders’ list, project cost summary
• Project team details, approval/review committee details, etc.

 

Henceforth, provide each detail in the playbook using similar icons for better understanding.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

Slide 8: Procurement Plan for Project Requirements Management

Explaining the procurement plan will give a path for ongoing construction. Hence, it provides information regarding the plan of construction for project requirements management, including details about:

 

• Description, date of request
• Requested by department
• Procurement method selection, action date
• Delivery date, status, project name
• Updated by project scope
• Project justification
• Project manager, final date, etc.

 

Likewise, one must illustrate the procurement plan of construction projects in their playbook. It defines your company’s planned vision and objectives for the future effectively.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

Slide 9: Work Breakdown Structure for Construction Project Tasks Management

This slide depicts the work structure. It presents the structure to make work more manageable across different segments, such as:

 

• Project defining
• Design & tender
• Construction
• Project closure

 

Moreover, for construction project tasks management, exhibit elements for segments mentioned above in the slide. Project defining includes drawings, completed work schedule, cost plan, end-stage report, etc. The design segment includes contractor selection, work design, status report, etc.

 

Likewise, the construction segment includes mobilization of contractors, re-installation, certifying all areas clearly, etc. At last, the project closure segment must consist of end-stage report submission, project closure approval, etc.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

Slide 10: Risk Mitigation Plan to Manage Key Construction Project Concerns

Defining a risk mitigation plan will ensure safety in work environment. Thus, this slide provides information regarding the plan that detects & manages key construction project issues for successful completion by limiting uncertainties associated with the project.

 

Key highlights to mention in the risk mitigation plan for the construction project includes:

 

• The date on which concern is raised, ID, risk description
• Its impact on the project, current status, risk impact
• Likelihood & severity on a scale of 1 – 5
• Risk area, escalation requirement details
• Risk response, expected resolution date
• Contingency plan, final status
• Construction project name, project manager
• Report date, location, etc.

 

Henceforth, to manage key construction project concerns, one must prepare a robust risk plan for mitigation. Include all these elements while preparing one for your construction projects.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

Slide 11: Construction Material Safety Data Sheet

Illustrating the data sheet will guide you from future uncertainties. Thus, this slide displays a construction material safety data sheet, including details about product identification, first aid measures, etc.

 

Product identification must present the product's details, use, manufacturer name, emergency number, etc. Similarly, first aid measures must exhibit highlights for eyes, skin, ingestion, and inhalation.

 

Moreover, the construction safety data sheet must explain vital elements, such as:

 

• Accidental release measures
• Hazards identification
• Firefighting measures
• Handling & storage
• Exposure control/personal protection, etc.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

Slide 12: Key People Involved in Construction Project Management Team

Display information regarding people responsible for the project. Hence, this slide presents details of key people involved in the construction project management team. Key people of whom you must include information are:

 

• Project owner
• Project manager
• General contractor

 

Additionally, exhibit their responsibilities in the slide. Like, the project owner is directly or indirectly responsible for project finances, supervises the entire project, makes critical decisions, etc.

 

Similarly, the project manager performs project cost estimations & negotiations, construction budget formulation, manages work orders, etc. And at last general contractor supervises daily operational activities, manages job site safety protocols, handles staff at the construction site, etc.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

Slide 13: Construction Budget Tracking to Manage Overall Costs

Last but not least guideline for the construction playbook is highlighting the budget tracking sheet. Thus, this slide provides information regarding construction budget tracking to manage overall costs with details of:

 

• Different construction activities
• The estimated cost associated with labor, material, & the actual cost
• Subcontractor/vendor name

 

Furthermore, while tracking the budget of construction to manage costs, variant activities that are taken into consideration are:

 

• Site preparation, preliminaries
• Plans & specifications, permits
• Floor structure, plumbing
• Ground works, zoning
• Building, environmental, etc.

 

Likewise, one must depict all these vital guidelines in their construction playbook. It will regulate, manage, and optimize the project's activities and let you prepare mitigation plans for the future.

 

 

Construction Playbook PowerPoint Template

Download this 100% Editable Slide from Playbook Template

 

 

End Notes!

Building a killer construction playbook will require a superb foundation and a strong team. Not only this, they must have deep knowledge of the business and a firm grasp of the language of the industry.

 

Additionally, whether an entrepreneur or a contractor, you need a construction playbook.

 

And, if you don't have the time and resources for all this, then download the Construction Playbook template drafted by SlideTeam.

 