category-banner

Key Elements Effecting Construction Labour Productivity

Rating:
80%

You must be logged in to download this presentation.

Favourites
Loading...
Looking for similar designs with different nodes/stages ?

PowerPoint presentation slides

The following slide showcases some factors impacting labour productivity during construction activity. It includes overtime, absenteeism, flaws and piling of trades. Presenting our set of slides with Key Elements Effecting Construction Labour Productivity. This exhibits information on four stages of the process. This is an easy to edit and innovatively designed PowerPoint template. So download immediately and highlight information on Overtime, Absenteeism, Piling Of Trades.

Ratings and Reviews

80% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 80%

    by Dexter Weaver

    Excellent design and quick turnaround.
  2. 80%

    by Edmundo Watkins

    Love how there are no boring templates here! The design is fresh and creative, just the way I like it. Can't wait to edit and use them for my extended projects! 

2 Item(s)

per page: