category-banner

Key Elements Effecting Construction Labour Productivity

Rating:
80%

You must be logged in to download this presentation.

Favourites
Loading...
Impress your
audience
100%
Editable
Save Hours
of Time

PowerPoint presentation slides

The following slide showcases some factors impacting labour productivity during construction activity. It includes overtime, absenteeism, flaws and piling of trades. Presenting our set of slides with Key Elements Effecting Construction Labour Productivity. This exhibits information on four stages of the process. This is an easy to edit and innovatively designed PowerPoint template. So download immediately and highlight information on Overtime, Absenteeism, Piling Of Trades.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

80% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 80%

    by Darren Olson

    Informative design.
  2. 80%

    by Dana Owens

    This design is not only aesthetically pleasing but it has many uses making the cost worthwhile. The graphics look stunning, and you can edit them as per your needs. 

2 Item(s)

per page: