category-banner

KPIs To Measure For Corrective Action Plan In Manufacturing

Rating:
100%

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

This slide consists of major key performance indicators which are used by managers to measure for corrective action plan in manufacturing. Major key performance indicators are number of open issues, average time to closure, number of overdue issues etc.Introducing our KPIs To Measure For Corrective Action Plan In Manufacturing set of slides. The topics discussed in these slides are After Identification, Controls Implemented, Average Closure. This is an immediately available PowerPoint presentation that can be conveniently customized. Download it and convince your audience.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

100% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Richard Scott

    Awesome presentation, really professional and easy to edit.
  2. 100%

    by Deon Warren

    Qualitative and comprehensive slides.

2 Item(s)

per page: