category-banner

Performance Testing Strategies To Boost Endurance Testing For Software Quality Assurance

Rating:
90%

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

This slide discusses the endurance testing of software to test its performance after prolonged use. The metrics used in endurance testing are test memory leakage, test response time, test connection closure between different system layers, etc. Introducing Performance Testing Strategies To Boost Endurance Testing For Software Quality Assurance to increase your presentation threshold. Encompassed with seven stages, this template is a great option to educate and entice your audience. Dispence information on Endurance Testing, Software Quality Assurance, Test Memory Leakage, Test Response Time, using this template. Grab it now to reap its full benefits.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 80%

    by Devon Ferguson

    Been using SlideTeam for some time now…can’t imagine why I wasted all that time in front of the screen trying to make the perfect presentation.
  2. 100%

    by Demetrius Boyd

    I am a big fan of their newsletters because that is how I found my perfect requirement at the time of urgency. Thank God, I kept opening those.

2 Item(s)

per page: