category-banner

Software Roadmap Swimlane Backlog Dev agendado em andamento

Rating:
90%

You must be logged in to download this presentation.

Favourites
Loading...
Looking for similar designs with different nodes/stages ?

Características destes slides de apresentação do PowerPoint:

Apresentando este conjunto de slides com nome - Roteiro de software Backlog de raias Dev agendado em andamento. Este é um processo de quatro etapas. As etapas deste processo são o Roteiro de Software Swimlane, o Software Timeline Swimlane, o Roteiro de Programação Swimlane.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Clark Ruiz

    Innovative and Colorful designs.
  2. 80%

    by Darren Olson

    Illustrative design with editable content. Exceptional value for money. Highly pleased with the product.

2 Item(s)

per page: