category-banner

Waterfall Project Management Monthly Timeline For Waterfall Model Software Development

Rating:
80%

You must be logged in to download this presentation.

Favourites
Loading...
Impress your
audience
100%
Editable
Save Hours
of Time

PowerPoint presentation slides

This slide showcases the monthly timeline to develop a software project by using waterfall model. It includes phases such as analysis, design, implementation, testing, maintenance etcPresent the topic in a bit more detail with this Waterfall Project Management Monthly Timeline For Waterfall Model Software Development Use it as a tool for discussion and navigation on Timeline For Waterfall, Model Software Development This template is free to edit as deemed fit for your organization. Therefore download it now.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

80% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 80%

    by Ethan Sanchez

    The design is very attractive, informative, and eye-catching, with bold colors that stand out against all the basic presentation templates. 
  2. 80%

    by Clement Patel

    Nothing beats the well-formatted and professionally designed templates offered. Kudos to SlideTeam for their amazing collection of PPT slides.

2 Item(s)

per page: