category-banner

Project cost time and quality assessment for manager and product owner

Rating:
87%

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

This slide represents how product owner, scrum master and development staff involved in different activities and provide their assistance for improving the project. It has project management activities like- integration scope design, time management, cost management and quality management. Presenting our well-structured Project Cost Time And Quality Assessment For Manager And Product Owner. The topics discussed in this slide are Product Owner, Scrum Master, Development Team, Project Management Activity, Other Manager. This is an instantly available PowerPoint presentation that can be edited conveniently. Download it right away and captivate your audience.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

87% of 100
Write a review
Most Relevant Reviews

3 Item(s)

per page:
  1. 100%

    by Denny Salazar

    Informative design.
  2. 80%

    by Duncan Berry

    Very well designed and informative templates.
  3. 80%

    by Edmund Ortega

    Unique research projects to present in meeting.

3 Item(s)

per page: