category-banner

Step 5 Estimating Activity Durations For Creating Effective Project Schedule Management System

Rating:
90%

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

This slide presents estimating activity durations for project schedule management, helpful in determining cost of activities involved. It includes methods such as analogous estimating, parametric estimating and three point estimating Deliver an outstanding presentation on the topic using this Step 5 Estimating Activity Durations For Creating Effective Project Schedule Management System. Dispense information and present a thorough explanation of Analogous Estimating, Parametric Estimating, Three Point Estimating using the slides given. This template can be altered and personalized to fit your needs. It is also available for immediate download. So grab it now.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Chas Kelly

    The visual appeal of the templates is just unparalleled! I was so worried about the design of my presentation but SlideTeam made it all so easy. 
  2. 80%

    by Jones Adams

    I am a big fan of their newsletters because that is how I found my perfect requirement at the time of urgency. Thank God, I kept opening those.

2 Item(s)

per page: