category-banner

Waterfall Project Management Timeline For New Software Feature Addition With Waterfall

Rating:
90%

You must be logged in to download this presentation.

Favourites
Loading...

PowerPoint presentation slides

This slide provides the swimlane timeline for the addition of new feature in mobile application by using waterfall methodology. It includes phases such as research and identification, designing, development, testing and deployment. Present the topic in a bit more detail with this Waterfall Project Management Timeline For New Software Feature Addition With Waterfall Use it as a tool for discussion and navigation on Timeline, Software, Feature This template is free to edit as deemed fit for your organization. Therefore download it now.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 100%

    by Duncan Berry

    The best part about SlideTeam is their meticulously prepared presentations (complete-decks and single-slides both), infused with high-quality graphics and easy to edit. All-in-all worthy products.
  2. 80%

    by Connie Simmons

    What an exhaustive collection of templates you guys have there in slideteam. Impressive!!!

2 Item(s)

per page: